Sterling 75020140-0 Guida di Installazione Pagina 3

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 20
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 2
1. Preparation
Install the water supplies and drain piping according to the
roughing-in information.
Determine which template cut line corresponds with the lavatory
model to be installed.
Cut out the template where indicated for countertop opening. Cut
along the inside of the cutting line.
Position the template on the countertop.
Verify cabinet clearance beneath the countertop.
Trace around the template on the countertop with a pencil.
Template
Sterling 3 1032676-2-B
Vedere la pagina 2
1 2 3 4 5 6 7 8 ... 19 20

Commenti su questo manuale

Nessun commento